- YMCA Building – Ground floor Shop
- Loftus Signal Box Relocation and Restoration – A Sydney Trains Project
- Tramway Ave II – Street Track Relay
- Sutherland railway substation – A Sydney Trains project
- Rectification of the main gates
- Display Hall Modernisation Project
- Tramway Ave III – Road Surface Re-sheeting
- Army Hill Reconstruction 2015-2017
- South Shed services installation
- Princes Highway Crossing Approach Track Relay
Below are some of the overall pages documenting the major infrastructure projects that have occurred at the museum in the past decade. Regular updates to specific pages are listed above.