Sutherland line pole replacements – May 2015

18th May 2015

‘Smalls’ installed 4 new poles on the Sutherland line between TAFE and Army during the morning of 18th of May. The overhead branch will move the wire to the new poles in due course. Due to another job finishing earlier than expected, Small’s used two trucks and crews at the same time and knocked over the museum job quickly too.

These guys have the right tools and equipment and can get a pole in quickly and with little fuss.